How much does an air traffic safety technician make in Congo - Brazzaville?
This is an estimate of the median gross salary. That is FCFA 106,200 a month. estimate
- Equals
- $2,710
- Compared with the median pay in Congo - Brazzaville
- 1.3 times
- Data from
- 2009
Where Congo - Brazzaville ranks among 142 countries
Each line is a country, on a log scale from $100 to $100,000 a year.
In other countries
Median gross salary a year, in dollars.
| 1. Switzerland estimate | $99,860 |
| 2. Iceland estimate | $81,140 |
| 3. United States | $78,190 |
| 107. Nepal estimate | $2,862 |
| 108. Congo - Brazzaville estimate | $2,710 |
| 109. Liberia estimate | $2,549 |
| 142. Malawi estimate | $433 |
Similar jobs
Technicians and associate professionals
- Chief engineerFCFA 1,428,800
- Ship pilotFCFA 1,340,600
- Airline pilotFCFA 1,827,300
- Air traffic controllerFCFA 1,789,500
- Wind technicianFCFA 1,094,700
- Technical aideFCFA 1,250,800
- Electrical technicianFCFA 1,310,500
- Electronics engineering technicianFCFA 1,222,300
Frequently asked questions
How much does an air traffic safety technician make a month in Congo - Brazzaville?
The median gross salary is FCFA 106,200 a month, FCFA 1,274,600 a year.
How much does an air traffic safety technician make starting out and with experience?
The lowest-paid 10%, usually people starting out, make around FCFA 1,061,600 a year; the top 10%, with experience or senior roles, make more than FCFA 1,490,900.
Which country pays an air traffic safety technician the most?
United States, with a median of $78,190 a year before tax, according to our data.
Does an air traffic safety technician make more in Congo - Brazzaville or in United States?
In United States: $78,190 a year against $2,710 in Congo - Brazzaville, 28.9 times more.
Who makes more, an air traffic safety technician or a chief engineer?
A chief engineer: FCFA 1,428,800 a year against FCFA 1,274,600 for an air traffic safety technician, 1.1 times more.
Source: International Labour Organization (ILOSTAT), pay by major occupation group, 2009. How we calculate